Milestones

[vc_row full_width=”stretch_row” css=”.vc_custom_1497371006792{margin-bottom: 24px !important;padding-top: 80.5px !important;padding-bottom: 80.5px !important;background: #5dac6c url(http://dixnow.com/plastifar_wp/en/wp-content/uploads/sites/2/2017/05/banner-dark.png?id=308) !important;}”][vc_column 0=””][vc_custom_heading source=”post_title” font_container=”tag:h1|text_align:left|color:%23ffffff” use_theme_fonts=”yes”][/vc_column][/vc_row][vc_row 0=””][vc_column][vc_column_text el_class=”text-block”]

Plastifar S. A.

1992

Start trading with Injection plants, straws extrusion, rigid containers
extrusion and thermoforming.

 

1994

We acquired new machinery, increasing by 32% our production.

 

1995

Foam cups plant starts.

 

1996

Starts Foam extrusion and Thermoforming plant, increasing capacity by
22%.

 

1997

Printing Cups starts.

 

1998

The first high-performance and high-tech machine to rigid plant,
increasing our production by 40% arrived.

 

1999

Increases the thermoforming and rigid machineries in the plant,
increasing by 32% our production.

 

2000

The first high-performance injection machines and high-tech to produce
disposable cutlery arrived.

 

2001

The first high-performance presses and molding technology Foam Cups
arrived.

 

2003

The first high-performance and high-tech machinesto Foam
thermoforming plant arrived.

 

2004

Cutlery combo’s prepackaged plant starts.
International sales and distributions starts.

 

2005

Clear containers plant start.

 

2006

Blow molding plant start.

 

2008

Another high performance machine and high-tech to thermoforming
and rigid containers is acquired, production capacity is doubling.

International sales increased 200%

 

2009

Foam Cups Plant Fuel-Oil changes to Natural Gas.

We migrated to SAP system from Epicor.

 

2011

Foam thermoforming plant is extended and built a ramp to dispatching
14 export trucks simultaneously.

 

2012

Polypropylene Plant Starts.

 

2013

PVC Plant starts (PlastiFilm).

Foam Cups Plant Gas Natural changes to Biomass
Energy.

Production line PET Starts.[/vc_column_text][/vc_column][/vc_row]